Uploaded image for project: 'Flink'
  1. Flink
  2. FLINK-9634

Deactivate previous location based scheduling if local recovery is disabled

    XMLWordPrintableJSON

Details

    Description

      With Flink 1.5.0 we introduced local recovery. In order to make local recovery work we had to change the scheduling to be aware of the previous location of the Execution. This scheduling strategy is also active if local recovery is deactivated. I suggest to also disable the scheduling strategy if local recovery is not enabled.

      Attachments

        Issue Links

          Activity

            People

              trohrmann Till Rohrmann
              trohrmann Till Rohrmann
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: